ANÁLISIS DE UN PLANO DE VIGAS
A.   MATERIALES
·        
V 308
EL. 585.4
s=0.5x1.3
| 
Barra | 
Longitud (m) | 
Peso (kg) | 
Precio | 
| 
P554 | 
8.04 | 
319.4292 | 
$ 757,366.63 | 
| 
P523 | 
8.04 | 
107.8164 | 
$ 255,632.68 | 
| 
P556 | 
3.6 | 
193.2336 | 
$ 458,156.87 | 
| 
P530 | 
1.6 | 
85.8816 | 
$ 203,625.27 | 
| 
TOTAL | 
706.3608 | 
$ 1,674,781.46 | 
 Volumen=4.84m3 
Dosificación para concreto de 3000psi
| 
Material | 
Unidad | 
Cantidad | 
| 
Cemento  | 
Bultos | 
7 | 
| 
Arena  | 
m3 | 
0.56 | 
| 
Grava  | 
m3 | 
0.84 | 
| 
Agua  | 
l | 
180 | 
| 
Material | 
Unidad | 
Cantidad | 
Precio | 
| 
Cemento  | 
Bultos | 
33.852 | 
$ 914,004.00 | 
| 
Arena  | 
m3 | 
2.70816 | 
$ 193,275.96 | 
| 
Grava  | 
m3 | 
4.06224 | 
$ 332,677.14 | 
| 
Agua  | 
l | 
870.48 | 
$ 8,704.80 | 
| 
TOTAL | 
$ 1,448,661.91 | 
·        
V 309
EL. 585.4
S=0.5x1.3
| 
Barra | 
Longitud (m) | 
Peso (kg) | 
Precio | 
| 
P554 | 
8.04 | 
319.4292 | 
$ 757,366.63 | 
| 
P523 | 
8.04 | 
107.8164 | 
$ 255,632.68 | 
| 
P555 | 
3.44 | 
15.3768 | 
$ 36,458.39 | 
| 
P556 | 
3.6 | 
193.2336 | 
$ 458,156.87 | 
| 
P530 | 
1.6 | 
85.8816 | 
$ 203,625.27 | 
| 
TOTAL | 
721.7376 | 
$ 1,711,239.85 | 
Volumen=4.84m3
| 
Material | 
Unidad | 
Cantidad | 
Precio | 
| 
Cemento  | 
Bultos | 
33.852 | 
$ 914,004.00 | 
| 
Arena  | 
m3 | 
2.70816 | 
$ 193,275.96 | 
| 
Grava  | 
m3 | 
4.06224 | 
$ 332,677.14 | 
| 
Agua  | 
l | 
870.48 | 
$ 8,704.80 | 
| 
TOTAL | 
$ 1,448,661.91 | 
·        
V 313
(Son 2)
EL. 585.4
S=1x1.3
S=1.75x2.3
S=1.75x1.3
| 
Barra | 
Longitud (m) | 
Peso (kg) | 
Precio | 
| 
P612 | 
7.34 | 
94.01072 | 
$ 222,899.42 | 
| 
P453 | 
6.39 | 
204.6078 | 
$ 485,125.09 | 
| 
P638 | 
4.37 | 
111.94192 | 
$ 265,414.29 | 
| 
P463 | 
5.84 | 
78.3144 | 
$ 185,683.44 | 
| 
P644 | 
7.85 | 
280.69245 | 
$ 665,521.80 | 
| 
P637 | 
10.42 | 
183.55872 | 
$ 435,217.73 | 
| 
P462 | 
10.49 | 
335.8898 | 
$ 796,394.72 | 
| 
P464 | 
10 | 
134.1 | 
$ 317,951.10 | 
| 
P645 | 
8.4 | 
300.3588 | 
$ 712,150.71 | 
| 
P461 | 
8.37 | 
1340.037 | 
$ 3,177,227.73 | 
| 
P627 | 
8.36 | 
267.6872 | 
$ 634,686.35 | 
| 
P618 | 
10.48 | 
268.45568 | 
$ 636,508.42 | 
| 
P465 | 
6.08 | 
108.7104 | 
$ 257,752.36 | 
| 
P636 | 
11.51 | 
884.52048 | 
$ 2,097,198.06 | 
| 
P602 | 
6.89 | 
220.6178 | 
$ 523,084.80 | 
| 
P643 | 
5.09 | 
521.54176 | 
$ 1,236,575.51 | 
| 
P466 | 
11.39 | 
203.6532 | 
$ 482,861.74 | 
| 
P602 | 
7 | 
537.936 | 
$ 1,275,446.26 | 
| 
P608 | 
11.63 | 
372.3926 | 
$ 882,942.85 | 
| 
P529 | 
4.6 | 
329.2128 | 
$ 780,563.55 | 
| 
P530 | 
1.6 | 
458.0352 | 
$ 1,086,001.46 | 
| 
P467 | 
8.1 | 
700.4718 | 
$ 1,660,818.64 | 
| 
P533 | 
2.6 | 
1573.8996 | 
$ 3,731,715.95 | 
| 
P531 | 
1.8 | 
155.6604 | 
$ 369,070.81 | 
| 
P585 | 
6.1 | 
60.634 | 
$ 143,763.21 | 
| 
P530 | 
1.6 | 
111.328 | 
$ 263,958.69 | 
| 
TOTAL | 
9838.26853 | 
$ 23,326,534.68 | |
| 
TOTAL 2 VIGAS | 
19676.53706 | 
$ 46,653,069.37 | 
Volumen=68.08m3
| 
Material | 
Unidad | 
Cantidad | 
Precio | 
| 
Cemento  | 
Bultos | 
476.53725 | 
$ 12,866,505.75 | 
| 
Arena  | 
m3 | 
38.12298 | 
$ 2,720,760.84 | 
| 
Grava  | 
m3 | 
57.18447 | 
$ 4,683,122.17 | 
| 
Agua  | 
l | 
12253.815 | 
$ 122,538.15 | 
| 
TOTAL | 
$ 20,392,926.91 | ||
| 
TOTAL 2 VIGAS | 
$ 40,785,853.81 | 
·        
V 314 
EL. 585.4
S=0.83x1.3
| 
Barra | 
Longitud (m) | 
Peso (kg) | 
Precio | 
| 
P615 | 
9.96 | 
550.2978 | 
$ 1,304,756.08 | 
| 
P654 | 
9.96 | 
134.7705 | 
$ 319,540.86 | 
| 
P556 | 
4.26 | 
101.62656 | 
$ 240,956.57 | 
| 
P530 | 
1.6 | 
76.3392 | 
$ 181,000.24 | 
| 
TOTAL | 
863.03406 | 
$ 2,046,253.76 | 
Volumen=10.2m3
| 
Material | 
Unidad | 
Cantidad | 
Precio | 
| 
Cemento  | 
Bultos | 
71.37585 | 
$ 1,927,147.95 | 
| 
Arena  | 
m3 | 
5.710068 | 
$ 407,516.13 | 
| 
Grava  | 
m3 | 
8.565102 | 
$ 701,439.03 | 
| 
Agua  | 
l | 
1835.379 | 
$ 18,353.79 | 
| 
TOTAL | 
$ 3,054,456.90 | 
·        
V 315 
EL. 585.4
S=1x1.3
| 
Barra | 
Longitud (m) | 
Peso (kg) | 
Precio | 
| 
P455 | 
4.98 | 
159.4596 | 
$ 378,078.71 | 
| 
P609 | 
7.18 | 
275.88432 | 
$ 654,121.72 | 
| 
P613 | 
7.37 | 
98.8317 | 
$ 234,329.96 | 
| 
P594 | 
8.16 | 
162.0984 | 
$ 384,335.31 | 
| 
P510 | 
11.94 | 
189.75048 | 
$ 449,898.39 | 
| 
P606 | 
10.66 | 
211.7609 | 
$ 502,085.09 | 
| 
P607 | 
5.07 | 
100.71555 | 
$ 238,796.57 | 
| 
P629 | 
11.73 | 
186.41316 | 
$ 441,985.60 | 
| 
P614 | 
10.24 | 
137.3184 | 
$ 325,581.93 | 
| 
P611 | 
10.34 | 
205.4041 | 
$ 487,013.12 | 
| 
P586 | 
6.55 | 
104.0926 | 
$ 246,803.55 | 
| 
P529 | 
4.6 | 
292.6336 | 
$ 693,834.27 | 
| 
P530 | 
1.6 | 
407.1424 | 
$ 965,334.63 | 
| 
TOTAL | 
2531.50521 | 
$ 6,002,198.85 | 
Volumen=20.94m3
| 
Material | 
Unidad | 
Cantidad | 
Precio | 
| 
Cemento  | 
Bultos | 
146.601 | 
$ 3,958,227.00 | 
| 
Arena  | 
m3 | 
11.72808 | 
$ 837,009.61 | 
| 
Grava  | 
m3 | 
17.59212 | 
$ 1,440,706.67 | 
| 
Agua  | 
l | 
3769.74 | 
$ 37,697.40 | 
| 
TOTAL | 
$ 6,273,640.68 | 
Total acero=$58.087.543,28
Total concreto= $53.011.275,21 
B.  
MANO DE OBRA
| 
Descripción | 
Unidad | 
Cantidad | 
Valor unitario | 
Valor total | 
| 
Cuadrilla AA | 
Hora | 
101.666225 | 
$
  20,500.00 | |
| 
TOTAL MANO DE OBRA | 
$
  2,084,157.61 | 
C.  
EQUIPOS Y HERRAMIENTAS
| 
Descripción | 
Unidad | 
Cantidad | 
Valor unitario | 
Valor total | 
| 
Mezcladora | 
hora | 
163.33245 | 
$ 5,000.00 | 
$ 816,662.25 | 
| 
Herramienta menor  | 
Global | 
$ 104,207.88 | ||
| 
Laminas para viga | 
m lineal | 
15 | 
$ 5,000.00 | |
| 
Alambre | 
kg | 
734.9752419 | 
$ 3,400.00 | 
$ 2,498,915.82 | 
| 
Mordaza en platina con cuña | 
m lineal | 
30 | 
$ 72.00 | 
$ 2,160.00 | 
| 
Parales | 
Unidad | 
50 | 
$ 105.00 | 
$ 5,250.00 | 
| 
TOTAL EQUIPOS Y HERRAMIENTAS | 
$ 3,502,195.95 | 
 Total construcción =$116.685.172,06


 